{"id":2128513,"date":"2024-02-01T16:25:00","date_gmt":"2024-02-01T14:25:00","guid":{"rendered":"https:\/\/maritza.info\/?p=2128513"},"modified":"2024-04-01T15:12:54","modified_gmt":"2024-04-01T12:12:54","slug":"%d0%bc%d0%b5%d1%81%d1%82%d0%bd%d0%be%d1%82%d0%be-%d1%83%d0%bf%d1%80%d0%b0%d0%b2%d0%bb%d0%b5%d0%bd%d0%b8%d0%b5-%d0%bd%d0%b0-%d1%84%d0%be%d0%ba%d1%83%d1%81-%d1%84%d0%b8%d0%bd%d0%b0%d0%bd%d1%81%d0%b8","status":"publish","type":"post","link":"https:\/\/maritza.info\/en\/2024\/02\/01\/%d0%bc%d0%b5%d1%81%d1%82%d0%bd%d0%be%d1%82%d0%be-%d1%83%d0%bf%d1%80%d0%b0%d0%b2%d0%bb%d0%b5%d0%bd%d0%b8%d0%b5-%d0%bd%d0%b0-%d1%84%d0%be%d0%ba%d1%83%d1%81-%d1%84%d0%b8%d0%bd%d0%b0%d0%bd%d1%81%d0%b8\/","title":{"rendered":"Project: Local Government in Focus, funded by the AMERICA FOR BULGARIA FOUNDATION"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-3-1024x829.png\" alt=\"\" class=\"wp-image-715804\" width=\"227\" height=\"184\" srcset=\"https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-3-1024x829.png 1024w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-3-300x243.png 300w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-3-768x621.png 768w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-3-1536x1243.png 1536w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-3-2048x1657.png 2048w\" sizes=\"(max-width: 227px) 100vw, 227px\" \/><\/figure><\/div>\n\n\n<h4 class=\"wp-block-heading\">Project Local Government in Focus<\/h4>\n\n\n\n<p>Project: Local Government in Focus, Grant Agreement No. BEE.1095.20230825 from 15.12.2023, funded by the <a href=\"https:\/\/us4bg.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">AMERICA FOR BULGARIA FOUNDATION<\/a><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>Implementation period: 36 months, starting from the date of signing the Grant Agreement No. BEE.1095.20230825<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-4\" style=\"margin-bottom:0\">\n<div class=\"wp-block-column has-white-color has-text-color has-background has-link-color wp-elements-7411b85136ee5d88b909c0497e84bf38 is-layout-flow\" style=\"background-color:#bf0d3e;padding-top:2em;padding-right:2em;padding-bottom:2em;padding-left:2em\">\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"single\" style=\"font-size:40px\"><img decoding=\"async\" loading=\"lazy\" width=\"180\" height=\"127\" class=\"wp-image-715577\" style=\"width: 150px;\" src=\"http:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/90f6-mayor-icon.png\" alt=\"\"><\/h2>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-white-color has-alpha-channel-opacity has-white-background-color has-background is-style-wide\"\/>\n\n\n\n<p class=\"has-text-align-center has-white-color has-text-color\">Increasing the transparency and accountability of election promises and commitments of candidates for mayors and municipal councilors.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column has-white-color has-text-color has-background has-link-color wp-elements-0b610f78ca8262c5e7db0eb08d501675 is-layout-flow\" style=\"background-color:#d1d1e1;padding-top:2em;padding-right:2em;padding-bottom:2em;padding-left:2em\">\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"family\" style=\"font-size:40px\"><img decoding=\"async\" loading=\"lazy\" width=\"512\" height=\"512\" class=\"wp-image-715627\" style=\"width: 120px;\" src=\"http:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/administration.png\" alt=\"\" srcset=\"https:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/administration.png 512w, https:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/administration-150x150.png 150w, https:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/administration-300x300.png 300w, https:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/administration-250x250.png 250w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><\/h2>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity is-style-wide\"\/>\n\n\n\n<p class=\"has-text-align-center has-white-color has-text-color\">Active involvement of citizens in the process of local governance and decision-making.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column has-white-color has-text-color has-background has-link-color wp-elements-7cf231719aedb0144518718ad5e64c05 is-layout-flow\" style=\"background-color:#002c77;padding-top:2em;padding-right:2em;padding-bottom:2em;padding-left:2em\">\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"patron\" style=\"font-size:40px\"><img decoding=\"async\" loading=\"lazy\" width=\"200\" height=\"200\" class=\"wp-image-3065\" style=\"width: 150px;\" src=\"http:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/198536-200.png\" alt=\"\" srcset=\"https:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/198536-200.png 200w, https:\/\/maritza.info\/wp-content\/uploads\/2019\/03\/198536-200-150x150.png 150w\" sizes=\"(max-width: 200px) 100vw, 200px\" \/><\/h2>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity is-style-wide\"\/>\n\n\n\n<p class=\"has-text-align-center has-white-color has-text-color\">Building a bridge between elected representatives and citizens by providing a communication channel for dialogue and feedback<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/maritza.info\/wp-content\/uploads\/2024\/03\/logo_project2_landscape_EN-1024x453.jpg\" alt=\"\" class=\"wp-image-2129525\" width=\"507\" height=\"220\"\/><\/figure><\/div>\n\n\n<p><\/p>\n\n\n\n<p>The project offers several solutions to the described problems in the context of the local elections held in Bulgaria in 2023:<\/p>\n\n\n\n<p>The project will collect the promises of the candidates for mayors and municipal councilors in the municipalities: Haskovo, Dimitrovgrad, Svilengrad and Stambolovo. This will enable the local population to get to know the promises of the elected representatives in one place and critically evaluate them. The project includes a survey among the local population to discuss with the local population the real problems faced by the communities in the respective municipalities. This information will be used to prepare proposals for inclusion in the municipal development program.<\/p>\n\n\n\n<p>After the mayors and municipal councilors are elected, the municipal councils are structured and operational, the project will monitor the implementation of the promises made during the pre-election campaign. This will increase the accountability and transparency of the elected representatives and allow citizens to assess whether they are actually addressing the challenges facing the municipalities.<\/p>\n\n\n\n<p>The project will conduct a post-election sociological survey to explore citizens&#8217; impressions and their interpretation of the election results. This will enable a citizen evaluation of the electoral process and support the analysis of the democratic legitimacy of the elected representatives.<\/p>\n\n\n\n<p>The creation of training modules for the elected municipal councilors will provide them with the necessary knowledge and skills for effective management and representation of citizens&#8217; interests. This will help the better functioning of municipal institutions and the implementation of policies aimed at the welfare of society.<\/p>\n\n\n\n<p>Combined, these activities will contribute to a better electoral process and strengthening the democratic participation of citizens, which in turn can improve the work of municipal institutions and stimulate the development of the private sector in the respective areas.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h5 class=\"wp-block-heading\">Activities:<\/h5>\n\n\n\n<p>Activity 1 : Upgrading the functionalities of the platform <a href=\"https:\/\/hs-tenders.haskovo.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/hs-tenders.haskovo.org\/<\/a> and publishing the results of each project activity at: <a rel=\"noreferrer noopener\" href=\"https:\/\/hs-tenders.haskovo.org\/localinfocus\/\" target=\"_blank\"><strong>https:\/\/hs-tenders.haskovo.org\/localinfocus\/<\/strong><\/a><\/p>\n\n\n\n<p>Activity 2: Collecting the promises of the candidates for mayors and municipal councilors in the municipalities of Haskovo, Dimitrovgrad, Svilengrad and Stambolovo. Analysis of the results of the elections in these municipalities after the elections and of the commitments made by the winning candidates for mayor and municipal councilors.<\/p>\n\n\n\n<p>Activity 3: Post-election sociological survey in the municipalities of Haskovo, Dimitrovgrad, Svilengrad and Stambolovo to identify community problems in the said municipalities and prepare recommendations for the inclusion of specific projects and solutions in strategic documents for the development of the respective municipality.<\/p>\n\n\n\n<p>Activity 4: Academy for elected municipal councilors.<\/p>\n\n\n\n<p>Activity 5: Monitoring of the implementation of the commitments made during the pre-election campaign by the elected mayors and municipal councilors in the municipalities: Haskovo, Dimitrovgrad, Svilengrad and Stambolovo.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h5 class=\"wp-block-heading\">Results:<\/h5>\n\n\n\n<p>Upgrading the functionalities of the platform <a href=\"https:\/\/hs-tenders.haskovo.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/hs-tenders.haskovo.org\/<\/a> and publishing the results of each project activity.<\/p>\n\n\n\n<p>Collected promises of the candidates for mayors and municipal councilors in 4 municipalities of Haskovo region<\/p>\n\n\n\n<p>Report of a post-election sociological survey conducted in the municipalities of Haskovo, Dimitrovgrad, Svilengrad and Stambolovo to identify community problems in the 4 municipalities. Preparation of a report with recommendations for the inclusion of specific projects and solutions in strategic documents for the development of the respective municipality.<\/p>\n\n\n\n<p>Organized and conducted trainings for municipal councilors in the municipalities in Haskovo region.<\/p>\n\n\n\n<p>Training materials developed and distributed.<\/p>\n\n\n\n<p>Monitoring of the implementation of the commitments made during the pre-election campaign by the elected mayors and municipal councilors in the municipalities of Haskovo, Dimitrovgrad, Svilengrad and Stambolovo.<\/p>\n\n\n\n<p>Media publications in electronic media\/information sites \u2013 information about the project, publication of a summary of the analyses, etc.<\/p>\n\n\n\n<p>Engaged 2 coordinators in connection with the implementation of project activities.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>\u201cSupport for the Grantee Regional Municipalities Association \u201eMaritza\u201c is provided by the America for Bulgaria Foundation. The statements and opinions expressed herein are solely those of the Grantee Regional Municipalities Association \u201eMaritza\u201c and do not necessarily reflect the views of the America for Bulgaria Foundation or its affiliates\u201d<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>The America for Bulgaria Foundation (ABF) is an independent, nonpartisan, and nonpolitical American grant-making foundation working in partnership with Bulgarians to strengthen the country\u2019s private sector and related democratic institutions.<\/strong><\/p>\n\n\n\n<p><strong>ABF builds on the success of the Bulgarian-American Enterprise Fund, an investment fund created in 1991 by the U.S. Congress with support from the U.S. Agency for International Development. For more information, please visit&nbsp;<\/strong><a href=\"http:\/\/www.us4bg.org\/\"><strong>www.us4bg.org<\/strong><\/a><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"www.us4bg.org\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-1-1016x1024.png\" alt=\"\" class=\"wp-image-715258\" width=\"158\" height=\"159\" srcset=\"https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-1-1016x1024.png 1016w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-1-298x300.png 298w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-1-150x150.png 150w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-1-768x774.png 768w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-1-1524x1536.png 1524w, https:\/\/maritza.info\/wp-content\/uploads\/2020\/12\/Untitled-1.png 1970w\" sizes=\"(max-width: 158px) 100vw, 158px\" \/><\/a><\/figure><\/div>","protected":false},"excerpt":{"rendered":"<p>Project Local Government in Focus Project: Local Government in Focus, Grant Agreement No. BEE.1095.20230825 from 15.12.2023, funded by the AMERICA FOR BULGARIA FOUNDATION Implementation period: 36 months, starting from the<\/p>\n","protected":false},"author":4,"featured_media":2133228,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0},"categories":[1],"tags":[],"translation":{"provider":"WPGlobus","version":"2.5.23","language":"en","enabled_languages":["bg","en"],"languages":{"bg":{"title":true,"content":true,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/posts\/2128513"}],"collection":[{"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/comments?post=2128513"}],"version-history":[{"count":50,"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/posts\/2128513\/revisions"}],"predecessor-version":[{"id":2129527,"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/posts\/2128513\/revisions\/2129527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/media\/2133228"}],"wp:attachment":[{"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/media?parent=2128513"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/categories?post=2128513"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritza.info\/en\/wp-json\/wp\/v2\/tags?post=2128513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}